For the residents of Ciptarasa Traditional Village, electricity is nothing new. For decades, the Ciganas Microhydro Power Plant (PLTMH) has supported their energy needs. Its presence is a vital part of daily life, from lighting their homes to using various electronic devices. Electricity from the Ciganas PLTMH is currently generally only available from around 4:00 PM to 7:00 AM WIB (Western Indonesian Time). This means residents cannot yet enjoy 24-hour electricity from the plant.
So, do residents need 24-hour electricity? How important is improving this service to them? These questions were part of a survey of Ciganas PLTMH users conducted in early November 2026. The results showed that daytime electricity demand is quite high. On the other hand, residents also desire better electricity quality and sustainable power plant management.

By utilizing water flow, the Ciganas PLTMH provides electricity for residents’ household needs. Although the power plant’s infrastructure is generally still functioning, and some components have received repairs with IBEKA’s technical support, its operational hours are still limited.
In fact, the need for electricity doesn’t stop at night. During the day, residents still need electricity to operate televisions, refrigerators, charge mobile phones, and even pump water.
This is evident in the survey results, where 96.77% of respondents stated they needed electricity during the day. In fact, when asked about the possibility of the micro hydro power plant operating 24 hours a day, 67.74% of respondents stated they would definitely use electricity during the day, while the remainder were still considering it.
These findings indicate that increasing the micro hydro power plant’s operating hours has the potential to provide tangible benefits to residents. 77.42% of respondents also considered 24-hour electricity service important.
Not Just 24-Hour Power, Electricity Quality Is Also Important
Interestingly, the need for electricity around the clock is not the only expectation of residents. When asked about priorities for micro hydro power plant development, 54.84% of respondents prioritized improving the quality and stability of electricity during current operating hours. Meanwhile, 41.94% chose 24-hour electricity service for all users.
One thing that needs to be considered is the condition of the electrical installations in residents’ homes. Of the 101 registered user homes, only 29 have Miniature Circuit Breakers (MCBs), while 72 do not. Furthermore, the condition of the cables and distribution network in users’ homes still requires attention to ensure the safety and stability of the electricity supply.
This means that the journey to 24-hour electricity service is not enough simply by operating the generators longer. Improvements to home installations, distribution networks, and safety devices are also necessary so that residents can enjoy electricity more safely and reliably.
Mutual Cooperation to Maintain Micro Hydro Power Plants
Optimizing Micro Hydro Power Plants requires not only technical improvements but also the support of residents as electricity users. The good news is that 96.77% of respondents stated their willingness to support efforts to optimize Micro Hydro Power Plants.
The most frequently chosen forms of support were mutual cooperation in installation and maintenance, willingness to pay maintenance fees, and helping to maintain the installations and electricity network in their homes.
However, the contribution amount and contribution mechanism still need to be discussed jointly to ensure it aligns with the residents’ capabilities and the plant’s operational needs.
On the other hand, increasing operating hours will also impact the management’s responsibilities. Currently, the Ciganas Micro Hydroelectric Power Plant (MHP) operation involves two operators tasked with starting, shutting down, and maintaining the plant. If service is increased to 24 hours, the need for monitoring and maintenance will undoubtedly increase.
Therefore, strengthening management capacity, dividing tasks, providing maintenance funds, and maintaining transparent financial records are crucial for maintaining the sustainability of the MHP.
Towards Better Electricity Services in Ciptarasa
A survey of Ciganas Micro Hydroelectric Power Plant users indicates that residents have needs and expectations for better electricity services. They require access to electricity during the day, desire more stable electricity quality, and demonstrate a willingness to support the optimization of the MHP.
However, efforts to achieve 24-hour electricity service need to be implemented in stages. Improvements to the installation and distribution network, improvements to electricity quality, strengthening management, and agreements regarding maintenance costs need to go hand in hand.
Through the Indonesian Low Emission Solution Program (SERI), the optimization of the Ciganas Micro Hydroelectric Power Plant (MHP) is part of an effort to strengthen access to clean energy that is not only oriented towards technology, but also towards the needs and readiness of the community.